The project features a grandstand roof integrated with the sound system and dynamic lighting in team colors, amplifying the atmosphere and fan engagement. Meanwhile, synchronized dynamic lighting on the exterior façade creates an immersive visual experience on match days and beyond, positioning the stadium as an iconic landmark after dark.
Grand Stade de Tanger
Tangier, Marocco
Customer challenge
The stadium needed to upgrade its lighting system to enhance the match atmosphere, elevate fan engagement, and create a striking visual experience for evening games. The existing infrastructure did not support dynamic light control, scenario-based ambience, or the latest broadcasting standards. The club sought a modern solution fully compatible with Signify’s high-tech, smart lighting platform, delivering impactful illumination across both the pitch and the stands. With our advanced ArenaVision BVP428 and ClearFlood BVP650 systems, the stadium now offers state-of-the-art lighting, ready to impress for AFCON 2025, the 2030 World Cup, and millions of fans across the continent.
The solution
Signify’s global expertise and comprehensive end-to-end engineering support — including design, integration, programming, and commissioning — ensured a seamless project delivery and long-term system reliability. The new lighting solution offers exceptional flexibility, allowing every layer of illumination to be tailored for matches, ceremonies, or special events. With high brightness, robust performance, and precise color rendering, the Signify system significantly enhances visual impact while improving operational efficiency.
The grand Stadium of tangier has been transformed into a striking night-time landmark. Its dynamic lighting enhances club identity, boosts fan engagement, and places the stadium at the forefront of digital innovation in the region.
And the sound–light synchronization intensifies the atmosphere, turning lighting into an active part of the fan experience.
Team
Certified System Integrator: Lamalif Group
Lighting Designer: Vivek Sreekumaran
Client / end user: ANEP
Products
ArenaVision: 470 BVP428 and 96 units BVP650 for the pitches
84 units BVP428 for the 3 training pitches
BCP383 UniStrip G4 : 3492 Units for the façade
Architecture level : 2 (PHAROS)
Discover other case studies
The KNVB Campus - Zeist, The Netherlands
Interact and Certified System Integrator Oostendorp Nederland B.V. teamed up to transform the KNVB Campus in Zeist – the beating heart of Dutch football.
Optimizing a Hoog Op Tennis Club’s lighting
Signify Certified System Integrator, Oostendorp Nederland, delivered an innovative, connected lighting solution to enhance the member experience at Hoog Op Tennis Club.
Ekinox Arena
Philips ArenaVision LED sports lighting in Ekinox Arena
Lacrosové hřiště Radotín
Signify provided Philips SunStay solar or hybrid-powered luminaires, improving the lighting in eight different municipalities across the Veneto region in Italy.
Smart office lighting – Arrival
Bus operator Arriva achieved complete control over their lighting and reduced energy usage thanks to Interact Pro.
Sevens Stadium - UAE
Lighting the future of sport with sustainability in every kick
A focus on fan experience and new revenue streams – Optus Stadium
With the goal of creating the ultimate fan experience, the recent all-LED lighting and Interact Sports software at Optus Stadium makes it the premier multipurpose venue in the Southern Hemisphere.
Smart lighting for best multipurpose arena experience – Buesa Arena
The Fernando Buesa Arena in Spain converted 100% of the lighting to LED and connected via a standard wired connection, all remotely controlled and managed with Interact Sports.
Fan experience and easy control – Allianz Stadium
Interact Sports offers an easy-to-use dashboard to control all the lighting systems in Allianz Stadium. Allianz now enjoys increased fan engagement, high-quality broadcast capabilities and new revenue potential.
Melbourne Cricket Ground by Lightmoves
The Melbourne Cricket Ground (MCG), a 100,000 person stadium in Melbourne, hosts major international, national, and local sporting events and concerts, including the Boxing Day Test, AFL Grand Final, and performances by artists such as AC/DC and Taylor Swift. The project involved retrofitting 12 electrical zones across 7 levels, replacing the legacy control system with a Dynalite solution to deliver enhanced, venue-wide control.
Connected stadium – fan experience
As Turkey’s largest multipurpose venue, the Sinan Erdem Arena has installed Interact Sports management software to bring a connected stadium concept to life using connected LED lighting infrastructure.
Starting a project?
We’d love to hear from you.