Global - English
Enhancing the fan experience
Enhancing the fan experience

Enhancing the fan experience

Sinan Erdem Arena

Istanbul, Turkey

With a seating capacity of 22,500 for concerts and 16,500 for tennis and basketball, the Sinan Erdem Arena is the largest multi-purpose indoor arena with dynamic lighting in Turkey.

“Our dynamic sports lighting elevates the Sinan Erdem Arena to one of Europe’s top sporting venues and it gives us immense pleasure to support the transformative and unifying power of sport.”

- Saner Kırık, Sales Director of Philips Lighting Project Channel for Turkey

Customer challenge

Known for hosting highly prestigious basketball matches, Sinan Erdem was ready to take the next steps to establish itself as an arena with an international presence. Stadium management wanted to enhance the fan experience while also increasing operational efficiency and opening up new revenue potential.

Stadium flexibility generates new revenue

 

Dazzling light and music shows give fans a unique experience while in the stadium, and LED pitch lighting ensures adherence to strict broadcasting requirements and flicker-free viewing at home. The new Interact Sports lighting management software allows remote programming of lighting configurations to give total flexibility of the stadium lighting, expanding the ability to host many different types of events. Interact Sports lighting asset management software also provides the venue management with real-time data on energy consumption and lighting performance.

Discover other case studies

The KNVB Campus - Zeist, The Netherlands

Interact and Certified System Integrator Oostendorp Nederland B.V. teamed up to transform the KNVB Campus in Zeist – the beating heart of Dutch football.

Optimizing a Hoog Op Tennis Club’s lighting

Signify Certified System Integrator, Oostendorp Nederland, delivered an innovative, connected lighting solution to enhance the member experience at Hoog Op Tennis Club.

Grand Stade de Tanger by Lamalif

The Ibn Batouta Stadium in tangier stands as a true showcase of Signify’s cutting-edge lighting technology. Featuring Arenavision with BVP428 luminaires for the pitch and ClearFlood BVP650 for the stands, and Unistrip BCP383 for the façade. The stadium delivers unmatched visibility, safety, and ambiance for players and fans alike. This state-of-the-art system positions the venue at the forefront of global sports infrastructure, ready to shine brilliantly for AFCON 2025, the 2030 World Cup, and millions of passionate fans across the continent.

Ekinox Arena

Philips ArenaVision LED sports lighting in Ekinox Arena

Lacrosové hřiště Radotín

Signify provided Philips SunStay solar or hybrid-powered luminaires, improving the lighting in eight different municipalities across the Veneto region in Italy.

Smart office lighting – Arrival

Bus operator Arriva achieved complete control over their lighting and reduced energy usage thanks to Interact Pro.

Sevens Stadium - UAE

Lighting the future of sport with sustainability in every kick

A focus on fan experience and new revenue streams – Optus Stadium

With the goal of creating the ultimate fan experience, the recent all-LED lighting and Interact Sports software at Optus Stadium makes it the premier multipurpose venue in the Southern Hemisphere.

Smart lighting for best multipurpose arena experience – Buesa Arena

The Fernando Buesa Arena in Spain converted 100% of the lighting to LED and connected via a standard wired connection, all remotely controlled and managed with Interact Sports.

Fan experience and easy control – Allianz Stadium

Interact Sports offers an easy-to-use dashboard to control all the lighting systems in Allianz Stadium. Allianz now enjoys increased fan engagement, high-quality broadcast capabilities and new revenue potential.

Melbourne Cricket Ground by Lightmoves

The Melbourne Cricket Ground (MCG), a 100,000 person stadium in Melbourne, hosts major international, national, and local sporting events and concerts, including the Boxing Day Test, AFL Grand Final, and performances by artists such as AC/DC and Taylor Swift. The project involved retrofitting 12 electrical zones across 7 levels, replacing the legacy control system with a Dynalite solution to deliver enhanced, venue-wide control.

Starting a project?

Starting a project?

We’d love to hear from you.